Skip to content
Tariff data · 2026-08-27
← Salt River Project · AZ

E-27P Tier 1 SRP Residential Demand Price Plan Pilot - Pilot Price Plan for Residential Demand Rate Service (Amp Service 0-225)

When does peak hit on Salt River Project’s E-27P Tier 1 SRP Residential Demand Price Plan Pilot - Pilot Price Plan for Residential Demand Rate Service? Peak hits 2pm–8pm every day, all year.

  • peak8.23¢
  • mid6.34¢
  • off-peak5.60¢
drag to turn
Every hour of the year at this rate, drawn to scale — 24 hours across, 12 months deep, height is ¢/kWh. The tallest bar is 8.2¢ (Jul, 2pm), the shortest is 5.6¢ (May, midnight) — 1.5× apart.
Weekdays
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Weekends
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

What does E-27P Tier 1 SRP Residential Demand Price Plan Pilot - Pilot Price Plan for Residential Demand Rate Service cost a year?

HouseholdUsesA monthPer yearWorks out to
Apartment

One or two people, no central air, no electric heat

4,866 kWh$45$54611.2¢ / kWh
Family home

Three or four people with central air conditioning

9,453 kWh$70$8378.9¢ / kWh
Home with an EV

Same house, plus an electric car charging overnight

13,103 kWh$88$1,0598.1¢ / kWh

Estimates, not quotes. We run three made-up but realistic households through this tariff hour by hour for a full year — including the way air conditioning loads the afternoon and an EV loads the small hours. Your own bill depends on when you actually use electricity, which is exactly the thing a per-kWh number hides.

What you actually pay

PeriodRateApplies when
peak8.23¢2pm–8pm, July–August
mid6.73¢5am–9am, 5pm–9pm, November–April
mid6.62¢2pm–8pm, May–June, September–October
mid6.34¢9pm–5am, 9am–5pm, midnight–midnight, November–April
mid6.13¢8pm–2pm, midnight–midnight, July–August
off-peak5.60¢8pm–2pm, midnight–midnight, May–June, September–October

Plus a fixed charge of $20 per month.

This plan also bills a demand charge based on your highest single hour of usage. We don’t price that yet, so treat any total here as incomplete.

Should you be on E-27P Tier 1 SRP Residential Demand Price Plan Pilot - Pilot Price Plan for Residential Demand Rate Service?

This plan bills a demand charge on top of the per-kWh rates: a fee tied to your single highest hour of the month. Two homes using the same total electricity can pay very different amounts if one of them runs the dryer, the oven, and the car charger at the same moment. We do not price demand charges yet, so treat every dollar figure on this page as a floor, not a total.

Before a single kilowatt-hour moves, this plan charges $240 a year in fixed fees. On the apartment above that is 44% of the whole bill; on the house with a car charging in it, 23%. Fixed charges are invisible in a cents-per-kWh comparison and they punish small users hardest — if you use very little electricity, the headline rate is the least important number on this page.

Expect the bill to move with the calendar. The same family home costs about $94 in July and $59 in February — a $36 spread driven by heating and cooling far more than by anything you chose. Budget against the July figure, not the average, and a summer bill stops being a surprise.

Other Salt River Project plans

All 37 Salt River Project plans →

Who can be on Salt River Project’s E-27P Tier 1 SRP Residential Demand Price Plan Pilot - Pilot Price Plan for Residential Demand Rate Service (Amp Service 0-225)?

Eligibility is not our judgement — it is written into the tariff Salt River Project filed. This is what that document says:

Availability of this E-27 P Pilot Price Plan will be solely determined by SRP, and is subject to equipment availability and other conditions, as determined in SRP's sole discretion. No more than 5,000 customers may concurrently participate on this pilot price plan. Service under this price plan is limited to residential customers without on-site generation.

Shortened — the clause runs longer in the filing. Quoted from the filed tariff. Your utility decides eligibility, not us; check with them before you switch.

If this is new to you

Where this comes from

Effective
2026-01-01

the date this tariff took effect

Covers
delivery + supply

the ZIP-code service map lists this territory as bundled, so the utility sells delivery and supply together

Enrollment
open to new customers

Tariff document: https://www.srpnet.com/assets/srpnet/pdf/price-plans/FY26/TCA%20Ratebooks/2025-Ratebook-with-2026-TCA-with-cover.pdf